Project info Date: January 2020 Category: WeldingGate ModificationThe gate was outside the concrete structure and was modified to fit inside. The cement structure was not level. Other worksWeldingModified gateRead morePost navigation Previous PortfolioVinyl flooring Next PortfolioElectrical Pressure Switch Connection